Job Closeout Checklist

MM slash DD slash YYYY
I, (the crew lead) walked the jobsite with the TM/ Customer to ensure the job was done with quaility and we left the jobsite in better condition than when we found it.(Required)
Is material stacked neatly and ready to ship?(Required)
Picture of stacked material(Required)
Accepted file types: jpg, jpeg, png, gif.
Is the trash cleaned up and all taken to the dumpster?(Required)
Clear Signature
TM's(Required)