Handoff Checklist Date(Required) MM slash DD slash YYYY Project Name(Required)Installer(Required)Kelly and ClarkCrew Lead(Required)(Foreman) Walk Project with TM/CMG/REP. Inspect for cleanliness, potential problems, readiness for application(Required) Yes No - TM/CMG/REP not on Site (Foreman) Measure Sqft of area(s) to confirm work order is accurate. List each system to install and sqft of each.(Required)Sort and verify material quantities by step/task, confirm coverages are accurate. (If Issues, Explain)(Foreman) Inspect PPE for all crew members, does everyone have proper PPE?(Required) Hearing Protection Safety Glasses Hard Hats Steel Toe Boots Hand Protection Hi-Vis Clothing Are there floor drains?(Required) Yes No What is the Height?(Required)Will the flooring system be flush with the drains currently? Yes No If no - Have you contacted the GC?(Required) Yes No List potential Hazards/Delays/Issues(Required)List SolutionsTM's Andrew Bedair Hunter Polk Joe Fox John Brown Matt Skwira Nate Ramirez Nate Richardson Steve Anderson Nathan Cotkin Other